194.5 batches of cob stomped by foot and applied by hand and you get:

100percentcobwalls

Yesterday afternoon and this morning, I put some final touches on the cob walls, leveling them in preparation for the soon-coming reciprocal roof. After I smoothed out some of the last cobs, I took a minute as I stood on the lean-to trestle, just staring down at the walls which now easily tower over my head, and I wondered in amazement.

It has been quite a journey to this point, moving over 40 tons of material. That’s a lot of earth. More specifically, it’s been 194.5 batches of cob so far. All this over 57 days (which were not all full work days, mind you.)

And it’s not over yet, but this massive portion of the process is, at least. Here are some photos of the structure.

100percent-int-s
Interior, looking southwest.The bed will be positioned along the far wall, under the window. The joists will support a 7.5′ wide, 22″ deep storage shelf.

100percent-int-n 100percentcobwalls-n
The north wall interior, with nooks and a shelf at the foot of the (future) bed. The rocket stove will be to the left of the window. Exterior backside, looking southwest.

100percent-doorway 100percent-biigshelf
Entryway with storage nooks. A gigantic corner bookshelf.

100percent-whew
Happy.